Westin Peachtree Hotel
The Westin Peachtree Hotel became a very complex project. The job initially started as a facade restoration project which included: facade cleaning, cutting and patching defective concrete, facade waterproof coatings, window caulking, and Excalibur Waterproof roof coatings.
Construction was 75% completed when a tornado hit the building. Watts Restoration had scaffolding on the building and was hired to make emergency repairs throughout the building which included demolishing broken glass that was hanging 700 feet in the air. All glass was removed from site. Watts then boarded up the openings with plywood protection.
Click here to see tornado repair photos.