South Street Bridge

Watts was hired to repair defective concrete throughout, including stone masonry cutting and pointing.

  • All work was done on a barge over the river.
  • Scaffolding was placed on the barge.
  • All demolition was contained to keep out of the water.
  • After demolition forms were installed, new concrete was placed within forms.